A complete reconstruction of locker rooms and showers plus redoing the pool deck and interior pool repairs. The work also involved replacing the existing moveable bulkhead with a new easier to move floating style. The bulkhead was delivered in one piece 5 ft high by 50 ft long so it was a major feat getting it into the building and placed in the pool.
